Use cases

As-built markups

Red-line what changed in the field so the drawings match what was built.

How does it work?

  1. Open the issued set

    Start from the drawings the work was built to.

  2. Red-line the changes

    Use the pen, clouds and arrows to show what moved, what was added and what was left out.

  3. Count what was installed

    Tap fixtures or devices to get real installed counts for closeout.

  4. Keep it together

    The marked-up set stays in the project for the next person who needs it.

The tools you'll use

Count markers, the pen and highlighter, clouds and arrows, and text callouts. Every markup tool is free. Site surveys with data export are on Pro.

See every tool
Count markers numbered 1 to 10 on the desks of an open office

Bring your next drawing set

Free to start. Nothing to install.

Open Survey free